HRC

 

 Observatories

  Kowsar.1

  Kowsar.2

 eLearning

  eLearnix

  Moon Explorer

 Live Webcast

  Universe Alive

  Astronotice

 Remote Control Lab.

  Phoenix

        DgLab

 Global Broadcasting

  HRC News

  VOS News

  Radio VOS

  Sky Dreams Group

  About HRC

 

   eServices

 

 

 
 Moon Explorer
 K1 Photo Gallery
 SMS Services
 eShop
 eLearning
 آموزش الکترونیک
 رادیو صدای آسمان
 کاوشگر ماه
 خدمات پیام کوتاه
 فروشگاه اینترنتی

 

 

رادیو کالج پارک

 

 

 

Transit of Venus  June 8, 2004

Final Report

Reported By: Mohammad Akoochekian

 

Venus Transit 2004 Photos

HRC Program For Transit

Numerical Results

Simulation Match 2004

 

 

 

Finally after two years research, studying and programming Venus planet became close to its transit time. Since 2002 till now HRC astronomy department had programs for transit to do all things correct and get useful results. Many information and data had been obtained form internet and books. Also, K1 observatory equipped to  modern tools for live webcasting and digital photographing. Our live broadcasting was introduced By:

In scientific part, astronomy department established a team consist of university and high school students for international common projects with Essen university (Germany), Nehru planetarium (India)Space India organizatin, a group in Mauritius and a group in Spain. These projects were:

Following HRC members were participants of these international projects:

 

Marzieh Pooramrolahi

(Team Manager)

Nasim Khosravi

Project 1,5

Akram Mir Ahmady

Project 2

Mina Soltan Gheis

Projetc 3

Zahra Eizady

Project 4

Mansooreh Pezeshkzad

Project 5

 

Scientific and technical teams had more than 20 observation camping in K1 observatory. They tested their equipments and increased their own experiences, because they know this golden opportunity will not repeated till 8 years later and at that date Iran hasn't suitable position for transit observation.

Now, After two years we were coming toward K1 observatory for Venus transit. After 122 years we were repeating what past scientists had been done to record transit data but this time by modern tools. We started our movement on June 07, 2004 at 19:30. The members of HRC team:

 

Moammad Akoochekian

(HRC President)

Dr Mohammad Rafieinia

Astro Dept Manager

Scientific Team

Ehsan Eslahi

HRC Public Comunication

Zoya Shokoohi

Telescope Controller

 

And Davood Pooladsaz in HRC controlled all technical things of live webcasting. Finally HRC team arrived to observatory at 20:15. They carried their equipments to the K1 observatory.

 

 

After one hour they install all equipments and started to align telescope, CCD  and testing internet connections for live webcasting. Marzieh Pooramrollhi, Zoya Shokoohi and Mohammad Akoochekian had these responsibilities.

 

 

After dinner that was a good time for rest and talk, the team started to work again. This stage was started with debating on form of projects doing. Akoochekian, Rafieinia and scientific team established some programs in different times for members. Then in the midnight some of them went to observation by telescope.

 

 

On 3:00 O'clock we finished our programs and went to sleep. In the morning of June 8 we waked up with sunrise. Chees, bread, tomato and ... were available for breakfast. A breakfast in happy space.

 

 

After breakfast again we started to work. The time of transit was close and There is no enough time for other activities. Some problems occurred in telephone line of observatory. So we must went to the factory manager's office, because he could help us to solve these problems soon. Mr Niknam helped us very well and the problems were solved sooner than we thought.

 

 

At this time other members in K1 turned on the telescope and were aligning it. Photographers were testing their tools to record transit with best quality.

 

 

The time of transit become closer and closer. All were await, wait to watch what no live human till now could observe. Wait to see result of their two-years attempts.

 

 

Now scientific team started their project to measure shadow lengths and times, to calculate culmination time and earth radius.

 

 

At 9:20 we started to live webcasting by sending an image from solar disk with this message "Hi Every Body, We Come" . I understood that about 20000 visitors are in HRCglobal.net. This was very good but if this number passed from 50000, many of visitors could not come into the HRC www to watch live transit. This problem happened about 9:40and number of visitors passed from 80000. My friend Ali Rahimi and me tried to solve this problem. But huge number of visitors caused other problems against our attempts.

 

 

Finally on 9:49 Venus slowly came over the solar disk. Marzieh Pooramrollahi, Dr Rafieinia and Zoya Shokoohi were searching to finde shadow of Venus on solar limb. Suddenly, they found it, the image was shown on monitor display. They fixed telescope on Venus and image recording started by analogue video and digital computer. All members looked at monitor display carefully. At this time Mr. Niknam (Shirin Nam factory manager) and his friend came into the observatory to watch transit.

 

 

Now other projects (photography, timing, data recording, ...) were started. We sent our image to the internet for all, around the world.

 

 

 

All members worked hardly to record data and photos from transit. Among the transit some engineers and technicians of factory came into the observatory to observe transit as live. The enjoyed when saw the Venus shadow on solar disk easily. We took many movies and photos till noon that we stopped work for lunch. For lunch HRC provided tuna fish and drink. All members in a friendly environment ate their lunch.

 

 

After lunch, members who their measurements had been finished, analyzed their own data. They obtained culmination time, the smallest shadow lenght, solar height of culmination, times of project 4, ... . They calculated what they want, very carefully. Other members went for their responsibility or rest. Some of them didn't sleep from last night so were very tired and need to little sleep.

 

 

At rest time high school students opened their school books and continued with studying, because the transit was placed among Iran schools and university examinations. After a little rest all, returned to their responsibility. We were very tired but some happy faces gave us great power to continue. These faces told us "cheer up", "power to you" .

 

 

Finally at about 15:30 the 3rd contact occurred. We record movie since first times till end of 4th contact. At this time engineers of factory came into the K1 to see last times of transit. When transit finished the happy voices and shouting of members filled the observatory. this was one the beautiful voice in my life. They congratulated together for this great success. We got all we wanted.  

 

 

 

Now we must be await for other countries data to calculate the Sun-Venus parallax. At the end of this great sky party, members took some memorial photos together.

  

 

 

 

 

 

 

HRC Shirin Nam

CHIDAK Gaz

 

 

 

About Us

Contact Us

Feedback

© 2000-2008 Hedayatgaran Research Center (HRC)

e-mail : info@hrcglobal.net

Updated in "March 15, 2005" by HRC Internet Group